Thursday, 19 Nov 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: Shiroro–Mando 330kV Transmission line now restored – TCN 
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Power Minister commissions 120MVA Billiri Substation, doubles Gombe transmission capacity to 600MVA  

By The Graphic November 19, 2026

INEC extends recruitment Portal for 2027 election staff to Dec. 3

By The Graphic November 19, 2026

World Toilet Day: Kpadna-Jabi Pupils forced into open defecation over lack of toilets

By The Graphic November 19, 2026

Bakare unveils Eight-Point Agenda, promises inclusive development for Kwara Federal Constituency

By The Graphic November 19, 2026

Kogi Assembly calls for immediate establishment of ICU at Specialist Hospital

By The Graphic November 19, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

Shiroro–Mando 330kV Transmission line now restored – TCN 

The Graphic
Last updated: February 17, 2026 8:55 pm
The Graphic
Share
1 Min Read
SHARE

From David Onuoja, Abuja

The Transmission Company of Nigeria (TCN), said that, it has restored the 330kV Shiroro–Mando Transmission Line 1, which is currently operational.

In a statement from the General Manager, Public Affairs of TCN, Ndidi Mbah, said the line was restored at approximately 3:27pm on Saturday, 14 February 2026, following the completion of repair works undertaken by TCN’s engineers.

With the restoration of Line 1, it added, bulk power supply to Kaduna Electric has significantly improved, and power supply constraints previously experienced in Kaduna have been alleviated.

Meanwhile, repair works are still ongoing on the 330kV Shiroro–Mando Transmission Line 2, and barring any unforeseen circumstances, restoration of Line 2 will be completed soon. This will further strengthen network redundancy and the overall system reliability.

Related News

Power Minister commissions 120MVA Billiri Substation, doubles Gombe transmission capacity to 600MVA  
NISO seeks EU collaboration to attract investments into Nigeria’s electricity sector
Reliable Power, key to $1trn economy -PCAN Chairman tells Stakeholders  
Closing Nigeria’s metering gap: 11 DisCos to get ₦30b Band “A” metering funds  
Power Minister Tegbe, FGN Power Boss to grace PCAN 2026 conference  

TCN, however, appreciated the patience, understanding, and cooperation of its customers and stakeholders throughout this period and remains firmly committed to delivering stable and efficient transmission service nationwide.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Court freezes nine Mineral-Laden trucks as EFCC intensifies war on illegal mining in Kwara
Next Article TCN engages Traditional Leaders to curb vandalism, encroachment of infrastructure
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Lungunda Traditional Council announces name change to Nungura in Adamawa 

From Joseph Adahnu, Yola The Lunguda Traditional Council of Guyuk Local Government Area of Adamawa…

By The Graphic

PFIPC scanda: Why Tinubu ordered ICPC to probe fake Presidential Council

From David Onuoja, Abuja President Bola Tinubu, has ordered the Independent Corrupt Practices and Other…

By The Graphic

NSCDC Tanke Division holds Medical Outreach, Security Summit

From Taiye Joseph, Ilorin. The Tanke Division of the Nigeria Security and Civil Defence Corps…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?