Wednesday, 19 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: TCN commissions 100MVA transformer at Alausa, to boosts Lagos Power capacity to 205MVA
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Kogi First Lady condemns domestic violence, visits woman reportedly burnt by husband

By The Graphic August 19, 2026

INEC pledges credible 2027 polls as IRI begins pre-election assessment

By The Graphic August 19, 2026

NISO, NBET synergizes to improve efficiency in electricity market in Nigeria

By The Graphic August 19, 2026

Tinubu challenges Varsities to produce Entrepreneurs, not just Degree holders

By The Graphic August 19, 2026

Nigerian Varsities must stop managing crises, embrace AI, innovation — CVCNU

By The Graphic August 19, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

TCN commissions 100MVA transformer at Alausa, to boosts Lagos Power capacity to 205MVA

The Graphic
Last updated: August 19, 2026 10:18 am
The Graphic
Share
4 Min Read
SHARE

…as FG hails TCN for its commitment

From David Onuoja, Abuja

The Transmission Company of Nigeria (TCN), has on Monday in Lagos, commissioned a new 1x100MVA, 132/33kV power transformer at the Alausa Transmission Substation, a move the company says will deliver more stable electricity to at least 70,000 residents in Alausa and surrounding communities.

Speaking at both events, Joseph Tegbe, Minister of Power, said the projects reflected the administration’s deliberate approach to fixing the sector’s structural bottlenecks: “Identify the bottleneck. Invest in it. Remove the constraint. Unlock the capacity.”

He linked the upgrades to President Bola Tinubu’s determination to “confront the infrastructure constraints that have limited Nigeria’s economic potential,” noting that ageing equipment and stranded capacity would continue to be addressed nationwide.

Related News

NISO, NBET synergizes to improve efficiency in electricity market in Nigeria
TCN loss Ikot Abasi–Eket 132kV Double Circuit Transmission line to vandalism
NISO pledges collaboration with GOSERC to improve electricity supply in Gombe
NERC revokes KAEDCO licence, dissolves Board over poor performance, ₦456bn debt
Power Minister Tegbe, inaugurate Rural Electrification Agency Board in Abuja

The Lekki project, executed by Shanghai Electric Group Company Limited, with World Bank support, also includes an additional 1x300MVA, 330/132kV transformer expected to be energised in November 2026.

TCN Managing Director and Chief Executive Officer, Engr. Sule Abdulaziz, who also spoke at the event, said the installation marks a major step in the Federal Government’s effort to strengthen the nation’s transmission network under President Bola Ahmed Tinubu’s Renewed Hope Agenda.

This new transformer replaces an existing 1x30MVA unit at the substation. With the upgrade, Alausa’s total capacity has risen by 70MVA, from 135MVA to 205MVA.

Engr. Abdulaziz explained that the increase was designed to meet growing load demand in the area and to improve service delivery through the Ikeja Electricity Distribution Company.

He noted that the project was executed by Messrs Shanghai Electric Ltd under a World Bank-funded initiative that began in January 2021. Despite implementation challenges, he said, TCN remained committed to delivering critical infrastructure on schedule. The transformer was energised to begin wheeling additional bulk power to distribution load centers.

Beyond Lagos, the TCN boss said the upgrade will have national benefits. “Beyond serving the immediate community, this upgrade meaningfully increases the quantum of bulk power that TCN can wheel to distribution load centers nationwide,” he stated.

According to him, the project reinforces grid stability and ensures more bulk power reaches distribution companies for onward delivery to consumers.

Engr. Abdulaziz credited the achievement to the continued support of the Presidency and the Honourable Minister of Power, whose leadership he described as instrumental to steady progress in the power sector.

He said the project aligns directly with the administration’s goal of building a robust transmission network capable of transporting Nigeria’s growing power needs.

In his closing remarks, the TCN MD thanked President Tinubu, the Minister of Power, the World Bank, the Lagos State Government, contractors, engineers and other stakeholders for their collaboration.

“On behalf of TCN, I extend our profound appreciation,” he said, adding that TCN remains resolute in its mandate to sustain and expand the transmission grid for a reliable power future.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article INEC pledges credible 2027 polls as IRI begins pre-election assessment
Next Article Kogi First Lady condemns domestic violence, visits woman reportedly burnt by husband
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

30 year-old man arrested in Adamawa for allegedly killing father, dumping body in well

From: Joseph Adahnu, Yola Operatives of the Adamawa State Police Command, has arrested a 30-year-old…

By The Graphic

Chief Emmanuel Sule conferred with traditional title 

By Ogalla Daniel The Ata Igala, HRM, Matthew Alaji Opaluwa Oguche Akpa, has conferred the…

By The Graphic

KWASU refutes viral claim on Law programme suspension, assures full accreditation

From Taiye Joseph, Ilorin The management of Kwara State University (KWASU), Malete, has responded to…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?