Sunday, 30 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NISO, WAPP-ICC, carries synchronization electrification test
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Jigawa At 35: Governor Namadi reaffirms commitment to peace, justice and sustainable development   

By The Graphic August 30, 2026

Gov. Bala Mohammed calls for peace, unity in Maulud message

By The Graphic August 30, 2026

ADC Guber Crisis: Omarana drags Party, INEC to Court over alleged substitution in Adamawa

By The Graphic August 30, 2026

NPC Chairman Aminu Yusuf dies at 66 after brief illness

By The Graphic August 28, 2026

Woro kidnapped survivors receive N1m, reunite with families after six months in Ccaptivity

By The Graphic August 28, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NISO, WAPP-ICC, carries synchronization electrification test

The Graphic
Last updated: November 9, 2025 7:23 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Nigerian Independent System Operator (NISO), in collaboration with the West African Power Pool Information and Coordination Centre (WAPP-ICC), has successfully carried out the long-awaited synchronization test between the Nigerian power grid in the region.

The Regional Countries which includes: Niger Republic and parts of Benin and Togo and the rest of West African, were part of the power grid that conducted the test on Saturday, 8th November 2025, between 05:04 hours and 09:04 hours, and marks a major breakthrough in the ongoing effort to establish a unified West African electricity grid operating at a single frequency.

According to a statement issued and signed by the Chairman Board of Directors/MD of NISO, Dr. Adesegun Akin-Olugbade and Engineer Abdu Mohammed, said although several synchronization arrangements had been proposed in the past, the only known physical synchronization attempt took place in 2007 and lasted for about seven minutes before being discontinued.

Related News

TCN decries true persecution of its equipments vandals
TCN to AEDC: Your accusation of tripping of Shiroro transmission line, inaccurate, misleading
FG launches RAMCO for power infrastructural sustainability
NISO pushes for stronger Hydro planning and stricter Governor compliance at 2026 Jebba meeting
NERC inaugurates KAEDCO Interim Board, visits Military Formations in Kaduna   

Following the renewed engagements and enhanced coordination between NISO and the WAPP-ICC, the exercise has been successfully accomplished through improved system monitoring, stricter frequency control, harmonized operational standards, and real-time communication among participating control centres.

The synchronization connects Area 1 (Nigeria, Niger, and parts of Benin and Togo) with Areas 2 and 3 (the rest of West Africa), creating a single operational grid that enhances reliability, stability, and cross-border energy exchange across the ECOWAS region.

This initiative was aimed to achieve operational unification of the regional grid, improve system reliability through shared reserves, enable cost-effective power generation and trading under the West African Electricity Market (WAEM), and strengthen institutional cooperation among member system operators.

For Nigeria, this achievement provides multiple benefits, including unlocking stranded generation capacity, enabling energy exports and foreign exchange earnings, improving grid resilience, and reinforcing the country’s leadership role in regional energy integration. It also opens access to donor funding for priority transmission projects such as the North Core Project in Birnin Kebbi and the Ajegunle 330 kV Substation in Lagos State.

The successful synchronization marks a historic milestone in regional energy cooperation and demonstrates NISO’s technical capacity to manage complex grid operations in line with international standards.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Gen. Shaibu storm Maiduguri, visits Operation HADIN KAI, motivates troops
Next Article Trump’s security advisory: Iginla advises Tinubu to dialogue
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Media, Adhoc staff’s voting before election duties, contains in new reform proposal -INEC

...to present proposals to National Assembly soon From David Onuoja, Abuja The Independent National Electoral…

By The Graphic

INEC fixes February 20 2027, as Presidential, NASS election

*Govs, States Assembly to hold March 6 From David Onuoja, Abuja The Chairman, Independent National…

By The Graphic

NISO, NBET synergise to improve efficiency in Nigeria’s electricity market

From David Onuoja, Abuja The Nigerian Independent System Operator (NISO), in collaboration with the Nigerian…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?