Monday, 2 Mar 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NISO, WAPP-ICC, carries synchronization electrification test
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Blood on the Border: How the Woro Massacre shattered quiet life in Kwara North

By The Graphic March 1, 2026

INEC aligns Party Regulations with Electoral Act 2026 to safeguard poll integrity

By The Graphic March 1, 2026

Aig-Imoukhuede Foundation opens applications for Sixth Cohort of Public Leaders Programme

By The Graphic March 1, 2026

Police recruitment: 50,000 Police constables screening to commence March 9

By The Graphic March 1, 2026

Cleric lauds Ododo for fostering inclusive governance

By The Graphic February 28, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NISO, WAPP-ICC, carries synchronization electrification test

The Graphic
Last updated: November 9, 2025 7:23 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Nigerian Independent System Operator (NISO), in collaboration with the West African Power Pool Information and Coordination Centre (WAPP-ICC), has successfully carried out the long-awaited synchronization test between the Nigerian power grid in the region.

The Regional Countries which includes: Niger Republic and parts of Benin and Togo and the rest of West African, were part of the power grid that conducted the test on Saturday, 8th November 2025, between 05:04 hours and 09:04 hours, and marks a major breakthrough in the ongoing effort to establish a unified West African electricity grid operating at a single frequency.

According to a statement issued and signed by the Chairman Board of Directors/MD of NISO, Dr. Adesegun Akin-Olugbade and Engineer Abdu Mohammed, said although several synchronization arrangements had been proposed in the past, the only known physical synchronization attempt took place in 2007 and lasted for about seven minutes before being discontinued.

Related News

AEDC explains reason for Power outage in Nasarawa State, Mararaba, Lafia, others
Power outage: 4,300 generation shortfall, reason behind scarce electricity supply in Nigeria -NISO
TCN Clears encroachments activities along Ihovbor–Ajaokuta 330kV Transmission Line
GenCos clarifies capacity payments, PPAs, amidst market challenges
TCN commission’s 300MVA Power Transformer at Egbin Transmission Substation, Lagos

Following the renewed engagements and enhanced coordination between NISO and the WAPP-ICC, the exercise has been successfully accomplished through improved system monitoring, stricter frequency control, harmonized operational standards, and real-time communication among participating control centres.

The synchronization connects Area 1 (Nigeria, Niger, and parts of Benin and Togo) with Areas 2 and 3 (the rest of West Africa), creating a single operational grid that enhances reliability, stability, and cross-border energy exchange across the ECOWAS region.

This initiative was aimed to achieve operational unification of the regional grid, improve system reliability through shared reserves, enable cost-effective power generation and trading under the West African Electricity Market (WAEM), and strengthen institutional cooperation among member system operators.

For Nigeria, this achievement provides multiple benefits, including unlocking stranded generation capacity, enabling energy exports and foreign exchange earnings, improving grid resilience, and reinforcing the country’s leadership role in regional energy integration. It also opens access to donor funding for priority transmission projects such as the North Core Project in Birnin Kebbi and the Ajegunle 330 kV Substation in Lagos State.

The successful synchronization marks a historic milestone in regional energy cooperation and demonstrates NISO’s technical capacity to manage complex grid operations in line with international standards.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Gen. Shaibu storm Maiduguri, visits Operation HADIN KAI, motivates troops
Next Article Trump’s security advisory: Iginla advises Tinubu to dialogue
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Prophet Iginla releases 2025 prophesies, warns Tinubu, Akpabio, Wike of eminent challenges

- Calls on Nigerians to be hopeful From David Onuoja, Abuja Prophet Joshua Iginla, General…

By The Graphic

Over 50 survivors hospitalised after Woro attack as Kwara North Senator demands tighter security

From Taiye Joseph, Ilorin No fewer than 50 residents of Woro community in Kaiama Local…

By The Graphic

FG unveils 990KW mini-grid Solar energy to power 3,900 households

From David Onuoja, Abuja The Federal Government has unveiled 990kW mini-grid of Solar energy in…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?