Monday, 9 Nov 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: TCN commences Abasi-Eket 132kV double-circuit tower rehabilitation 
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Power Minister Tegbe, FGN Power Boss to grace PCAN 2026 conference  

By The Graphic November 8, 2026

Power Minister Tegbe, FGN Power Boss to grace PCAN 2026 conference

By The Graphic November 8, 2026

Ododo promises to upgrade Kogi stadium, as All Campus Games ends  

By The Graphic November 8, 2026

Claim Of Gas Shortage: NNPC disagree with NISO says, Gas network available, anytime

By The Graphic November 8, 2026

Offa Robbery: Youth group says withdrawal of charges vindicates Saraki, Ahmed  

By The Graphic November 8, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

TCN commences Abasi-Eket 132kV double-circuit tower rehabilitation 

The Graphic
Last updated: September 28, 2026 10:05 pm
The Graphic
Share
2 Min Read
SHARE

From David Onuoja, Abuja

The Transmission Company of Nigeria (TCN), has commenced an urgent rehabilitation work on Towers J4 and N9 to N12 along the Ikot Abasi–Eket 132kV double-circuit transmission line, following the recent acts of vandalism.

According to TCN,  a site inspection which was carried out on Friday, September 25, 2026, where the Regional Manager, Engr. Nasir Bello, represented by the Assistant General Manager (AGM), Transmission, Port Harcourt Region, Dr. Ubani Raymond, said the inspection was aimed at ensuring strict adherence to engineering specifications and enable immediate adjustments where needed.

Raymond reported significant progress on the rehabilitation work noting that the vandalized towers had been completely dismantled, while the tower bases had been solidly recast.

He further urged residents of Ikot Abasi to remain vigilant and actively protect critical power infrastructure within their communities from criminal elements.

Related News

Power Minister Tegbe, FGN Power Boss to grace PCAN 2026 conference  
Power Minister Tegbe, FGN Power Boss to grace PCAN 2026 conference
Claim Of Gas Shortage: NNPC disagree with NISO says, Gas network available, anytime
Power Minister acknowledges electricity decline in the Country, attribute it to generation problem
TCN Benin Sub-Region receives truckload of spare parts to boost power supply  

Also speaking at the site, is the Head of Lines, Port Harcourt Transmission Region, Engr. Azuh Lucky, who underscored the importance of rigorous monitoring to ensure compliance with engineering standards and guarantee the quality of the rehabilitation work.

He commended TCN Management for strategically engaging two contractors to fast-track project execution. However, he noted that the challenging terrain and persistent rainfall had limited the pace of work.

The Principal Manager, Uyo Work Centre, Engr.  Eguaikhide Clement,  expressed satisfaction with the progress of the rehabilitation. He commended the contractors for their commitment and understanding of the urgency of completing the project.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Celebration as Umar Maikarfe and wife welcome new baby 
Next Article Faith without humility: How religious intolerance is fracturing Nigeria.
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Gov. Fintiri gives defected public office holders 24 hours to resign or loss benefits 

From Joseph Adahnu, Yola The Adamawa State Government, has issued a stern warning to political…

By The Graphic

Court fix December 3rd for re-arraignment of Ex-Kwara Governor over alleged N3 billion fraud

From Taiye Joseph, Ilorin A Kwara State High Court, presided over by Justice Mahmood Abdulgafar,…

By The Graphic

2023 Electricity Act: Akwa Ibom set to join electricity market, requests NERC transfer order

From David Onuoja, Abuja In compliance with the amended Constitution of the Federal Republic of…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?