Wednesday, 15 Jul 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NISO, WAPP-ICC, carries synchronization electrification test
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Power Minister, Tegbe to collaborate with ICPC fight against corruption in Power sector

By The Graphic July 15, 2026

MHWUN demands N550,000 living wage, seeks stronger security, gender inclusion for health workers

By The Graphic July 15, 2026

INEC Chair seeks better staff welfare, increased election funding for credible polls

By The Graphic July 15, 2026

N2.98bn Yola market reopens as Fintiri renames it Modibo Adama Modern Market

By The Graphic July 15, 2026

Kwara Police arrest suspected cultist, recover locally made pistol 

By The Graphic July 15, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NISO, WAPP-ICC, carries synchronization electrification test

The Graphic
Last updated: November 9, 2025 7:23 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Nigerian Independent System Operator (NISO), in collaboration with the West African Power Pool Information and Coordination Centre (WAPP-ICC), has successfully carried out the long-awaited synchronization test between the Nigerian power grid in the region.

The Regional Countries which includes: Niger Republic and parts of Benin and Togo and the rest of West African, were part of the power grid that conducted the test on Saturday, 8th November 2025, between 05:04 hours and 09:04 hours, and marks a major breakthrough in the ongoing effort to establish a unified West African electricity grid operating at a single frequency.

According to a statement issued and signed by the Chairman Board of Directors/MD of NISO, Dr. Adesegun Akin-Olugbade and Engineer Abdu Mohammed, said although several synchronization arrangements had been proposed in the past, the only known physical synchronization attempt took place in 2007 and lasted for about seven minutes before being discontinued.

Related News

Power Minister, Tegbe to collaborate with ICPC fight against corruption in Power sector
NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric
TCN, Transport Ministry, partner to power Kano Railway
Minister Wike’s intervention averts total blackout in Maitama after vandals hit substation
NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric

Following the renewed engagements and enhanced coordination between NISO and the WAPP-ICC, the exercise has been successfully accomplished through improved system monitoring, stricter frequency control, harmonized operational standards, and real-time communication among participating control centres.

The synchronization connects Area 1 (Nigeria, Niger, and parts of Benin and Togo) with Areas 2 and 3 (the rest of West Africa), creating a single operational grid that enhances reliability, stability, and cross-border energy exchange across the ECOWAS region.

This initiative was aimed to achieve operational unification of the regional grid, improve system reliability through shared reserves, enable cost-effective power generation and trading under the West African Electricity Market (WAEM), and strengthen institutional cooperation among member system operators.

For Nigeria, this achievement provides multiple benefits, including unlocking stranded generation capacity, enabling energy exports and foreign exchange earnings, improving grid resilience, and reinforcing the country’s leadership role in regional energy integration. It also opens access to donor funding for priority transmission projects such as the North Core Project in Birnin Kebbi and the Ajegunle 330 kV Substation in Lagos State.

The successful synchronization marks a historic milestone in regional energy cooperation and demonstrates NISO’s technical capacity to manage complex grid operations in line with international standards.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Gen. Shaibu storm Maiduguri, visits Operation HADIN KAI, motivates troops
Next Article Trump’s security advisory: Iginla advises Tinubu to dialogue
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Kogi Govt Celebrates Sen. Smart Adeyemi at 63

The Kogi State Government, has congratulated Distinguished Senator Smart Adeyemi, CON, on the occasion of…

By The Graphic

Kogi Assembly Speaker commits to Sports development 

...describes sector as veritable tool for youth employment, empowerment By Ogalla Daniel The Speaker of…

By The Graphic

Defection to APC won’t guarantee Enugu, Bayelsa, Governors victory in 2027

From David Onuoja Abuja The Former National Chairman Inter-party Advisory Council (IPAC), High Chief Peter…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?