Friday, 16 Oct 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: TCN commission’s 300MVA Power Transformer at Egbin Transmission Substation, Lagos
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Kogi begins 2027 budget consultations in Kabba, urges citizens to shape priorities

By The Graphic October 15, 2026

Jigawa partners Presidential CNG Initiative to expand alternative energy infrastructure   

By The Graphic October 14, 2026

Gov Ododo approves rehabilitation of Govt Science School 

By The Graphic October 14, 2026

Protecting Kogi residents remains a priority, Ododo assures Kabba-Bunu community 

By The Graphic October 14, 2026

Kogi announces new campaign billboard fees 

By The Graphic October 14, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

TCN commission’s 300MVA Power Transformer at Egbin Transmission Substation, Lagos

The Graphic
Last updated: February 23, 2026 8:37 pm
The Graphic
Share
1 Min Read
SHARE

The Transmission Company of Nigeria (TCN), revealed that, It has successfully commissioned a new 300MVA power transformer at its 330/132/33kV Egbin Transmission Substation in Lagos State.

Ndidi Mbah, the general manager, Public Affairs Unit, who released this in a statement said the addition has increased the substation’s capacity from 300MVA to 450MVA, enhancing bulk power availability for Ikeja Electricity Distribution Company (EKEDC), to supply customers in Ikorodu, Shagamu, Ijede, and surrounding areas.

According to its General Manager (Transmission), Lagos Region, Engrineer Adeshina Adeonipekun, stated that the project was completed in-house by TCN engineers in a record-breaking six weeks, aiming to strengthen the transmission network and improve power delivery nationwide.

This development is part of TCN’s ongoing efforts to enhance power supply in Nigeria, with similar projects underway in other regions, including the rehabilitation of transmission lines in Port Harcourt.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article TCN restores Shiroro-Mando Line 2, boosts power transmission
Next Article GenCos clarifies capacity payments, PPAs, amidst market challenges
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

NSCDC mobilises 2,280 Personnel to secure Kwara communities ahead of Easter

From Taiye Joseph, Ilorin The Kwara State Command of the Nigeria Security and Civil Defence…

By The Graphic

Rededicate yourself to duty, Perm Sec urges sports ministry staff

The Management and Staff of the Ministry of Youth and Sports Development, have been urged…

By The Graphic

Illegal tamparing of Meters: NERC order DisCos to prove through video, photographic documentation in the suspect’s presence

From David Onuoja, Abuja The Nigerian Electricity Regulatory Commission (NERC), has revealed and ordered that…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?