Sunday, 30 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: Lokoja Waterworks upgrade to cost ₦100bn – Commissioner
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Jigawa At 35: Governor Namadi reaffirms commitment to peace, justice and sustainable development   

By The Graphic August 30, 2026

Gov. Bala Mohammed calls for peace, unity in Maulud message

By The Graphic August 30, 2026

ADC Guber Crisis: Omarana drags Party, INEC to Court over alleged substitution in Adamawa

By The Graphic August 30, 2026

NPC Chairman Aminu Yusuf dies at 66 after brief illness

By The Graphic August 28, 2026

Woro kidnapped survivors receive N1m, reunite with families after six months in Ccaptivity

By The Graphic August 28, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Inside Kogi

Lokoja Waterworks upgrade to cost ₦100bn – Commissioner

The Graphic
Last updated: May 14, 2025 10:55 am
The Graphic
Share
3 Min Read
SHARE

By Kehinde Erin

The Commissioner for Water Resources, Engr. Yahaya Farouk, revealed that upgrading the Greater Lokoja Waterworks will cost about ₦100 billion.

Speaking with journalists, Farouk clarified that while some areas of Lokoja now have water supply, the current operation relies on temporary measures.

“The old waterworks is outdated. What we are using is a 1956 structure that was slightly improved in 1992. The pipes are worn out, the treatment facilities are obsolete, and the capacity no longer meets the demands of the growing population,” he stated.

Related News

2027 polls: South-South residents in Kogi rally behind Tinubu, Ododo 
Kogi launches capacity-building programme to boost digital literacy in civil service
Gov.Ododo, Ex-Gov Bello, Sen. Natasha, other dignitaries condole with Salawu over mother’s death
Kogi Govt inaugurates new Pension Commission, reaffirms commitment to retirees’ welfare
Gov.Ododo’s second term is assured — Humanitarian Affairs commissioner 

The old Lokoja water works was initially designed to supply 750,000 liters of water daily, catering to approximately 200,000 residents. However, Engr. Farouk pointed out that Lokoja’s current population has surged to an estimated 1.2 million, leaving the existing water infrastructure significantly inadequate.

He further stated that a thorough audit by the present administration revealed the need for a complete overhaul of the state’s water supply infrastructure.

According to estimates from contacted contractors, relocating the Greater Lokoja Water Scheme to a more appropriate site alone would cost over ₦100 billion.

Emphasising the flood-damaged water system inherited from the previous administration, Farouk stated that Governor Ahmed Usman Ododo’s administration acted quickly to restore supply, prioritising hospitals, schools, and other essential services.

He detailed the ministry’s three-pronged strategy: immediate diesel-powered pumping and emergency repairs, medium-term expansion to underserved areas of Lokoja, and a long-term plan for a complete system overhaul.

“For the long term, we are looking at redesigning the entire system, from intake to distribution. That’s where the ₦100 billion estimate comes in. We need to replace pipelines, build new treatment plants, and establish independent power systems to ensure reliability,” he said.

The Commissioner stated that the state government is actively engaged in discussions with international and local development partners to secure funding for the essential overhaul.

He reassured the public of the government’s commitment to prioritising critical social amenities, particularly water supply, and expressed confidence in Governor Ododo’s dedication to resolving water supply issues in the state capital and beyond.

He urged residents to remain patient as the government accelerates efforts to provide a long-term solution to the state’s water supply challenges.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Security agencies unite against crime surge in Kwara
Next Article Grief in Ilorin as murdered student finally laid to rest amid ongoing trial
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Christian Worship Center Lokoja marks thanksgiving, altar dedication

By Ocheni victory In line with the tradition of most Christian churches to celebrate their…

By The Graphic

Speaker calls on Kogi Christians to imbibe Lessons of Christmas

...says tolerance, perseverance, patience, forgiveness, key to Jesus teachings By Ogalla Daniel The Speaker of…

By The Graphic

Olamaboro Congratulates New Chief of Army Staff, Gen. Shaibu

From David Onuoja, Abuja The Executive Chairman of Olamaboro Local Government Area of Kogi State,…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?