Friday, 16 Jan 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: Tower collapses: TCN establishes vommittee to develop Advanced Network Monitoring System
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Fanwo salutes Pastor Babatunde Samuel on Birthday

By The Graphic January 16, 2026

Yakubu Mohammed (1948–2026): A Life of Courage, Conscience, and Commitment to Professional Ethics

By The Graphic January 16, 2026

Mentorship key to raising responsible, entrepreneurial touth – Unilorin Don

By The Graphic January 15, 2026

Prof Ogbo advocates harsher penalties to tackle corruption

By The Graphic January 15, 2026

Security: Kogi Govt orders demolition of criminal hideouts in Okene

By The Graphic January 15, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

Tower collapses: TCN establishes vommittee to develop Advanced Network Monitoring System

The Graphic
Last updated: March 13, 2025 7:43 pm
The Graphic
Share
2 Min Read
SHARE

From David Onuoja, Abuja

In a strategic effort to enhance grid stability and mitigating power system disturbances, the Transmission Company of Nigeria (TCN), has inaugurated a Network Monitoring System Development Committee.

According to a statement released by the general manager TCN, Ndidi Mbah, said, the committee’s primary objective, is to design and implement an advanced monitoring system equipped with integrated data analysis and real-time operational awareness capabilities to ensure optimization of generation and transmission resources in grid operations.

During the committee’s inauguration, the Executive Director, Independent System Operations (ISO), Engr. (Mrs) Nafisat Ali, highlighted the importance of this initiative. She Noted that the System Operator is responsible for managing the entire power system network, which includes planning and monitoring operations.

However, the current manual operation poses challenges in terms of visibility and tracking the activities of various stakeholders. On this, Engr. Nafisat, added that the increasing complexity of the power system necessitated the development of a comprehensive Network Monitoring System.

Related News

TCN seeks Lagos State Govt collaboration in protecting transmission facilities
Alaoji-Onitsha transmission upgrade: TCN, Others, launches sensitization programme with stakeholders
Nigerian end of year gift, as grid disturbance makes FG’s restoration claim a mirage
Improved gas supply boosts power generation in Nigeria – NISO
NISO reflects on progress, Lmkooks to a brighter 2026

On his part, the Committee Chairman, Engr. Ojo Oladeji, who is also the Assistant General Manager (Research) at ISO, said that TCN’s in-house engineers have proficiently maintained the system with locally developed solutions.

He also mentioned that the committee intends to leverage the capabilities of Phase Measuring Units (PMU), along with existing IoT data to meet its goals.

The eight-member committee will employ domestic technologies, including the Internet of Things (IoT), to develop the Network Monitoring System.

This system will be operational prior to the completion of the ongoing work on the Supervisory Control and Data Acquisition (SCADA) System and will subsequently serve as a backup.

The comprehensive deployment of IoT throughout the grid network, coupled with the integration of artificial intelligence (AI) tools across generation, transmission, and distribution data processing, will significantly enhance the project’s success, it said.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Vandalism in South South as four towers along Owerri-Ahoada collapses
Next Article NSCDC, NOA take Safe School Campaign to Kwara schools, warn against cultism, abuse
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Failure of power, water supply, Adamawa Poly students stage peaceful protest

From Joseph Adahnu, Yola The students of Adamawa State Polytechnic have embarked on a peaceful…

By The Graphic

Kwara Gov applauded for prompt payment of Medical Training Fund

From Taiye Joseph, Ilorin. The Association of Resident Doctors at Kwara State University Teaching Hospital…

By The Graphic

Ododo: From farmland to Government House

By Stephen Salawu Governor Ahmed Usman Ododo, the Executive Governor of Kogi State is a…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?