Friday, 16 Jan 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: First batch of 3.2m prepaid meters ready for delivery in April -FG
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Fanwo salutes Pastor Babatunde Samuel on Birthday

By The Graphic January 16, 2026

Yakubu Mohammed (1948–2026): A Life of Courage, Conscience, and Commitment to Professional Ethics

By The Graphic January 16, 2026

Mentorship key to raising responsible, entrepreneurial touth – Unilorin Don

By The Graphic January 15, 2026

Prof Ogbo advocates harsher penalties to tackle corruption

By The Graphic January 15, 2026

Security: Kogi Govt orders demolition of criminal hideouts in Okene

By The Graphic January 15, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

First batch of 3.2m prepaid meters ready for delivery in April -FG

The Graphic
Last updated: April 7, 2025 9:33 pm
The Graphic
Share
4 Min Read
SHARE

From David Onuoja, Abuja

The Federal Government has said that, it is set to receive the first batch of 3,205,101meters, procured to bridge the metering gap in the country.

In a statement by the Special Adviser, Strategic Communications and Media Relations to the Minister of Power, Bolaji Tunji, said, 75,000 meters under the International Competitive Bid 1 (ICB1) is expected by April 2025, followed by the second batch of 200,000 meters in May 2025.

He said that Federal government is committed to the financial and structured implementation plans in other to close the metering gap.

According to him, “Despite claims of stagnation, metering installations have been progressing steadily. Saying, as of December 2024, a total of 5,502,460 customers had been metered, representing about 55 percent of the 10,114,060 active electricity customers in Nigeria.

Related News

TCN seeks Lagos State Govt collaboration in protecting transmission facilities
Alaoji-Onitsha transmission upgrade: TCN, Others, launches sensitization programme with stakeholders
Nigerian end of year gift, as grid disturbance makes FG’s restoration claim a mirage
Improved gas supply boosts power generation in Nigeria – NISO
NISO reflects on progress, Lmkooks to a brighter 2026

In 2024 alone, 572,050 meters were installed. While the government acknowledges the existing metering gap, it is actively working to close it as quickly as possible.

However, the fact remains that a sizeable portion of active electricity users already have meters, countering the exaggerated portrayal of an industry in crisis”.

According to the statement, though installation rates have varied over the years, the sector maintains a yearly average of about 668,000 meters installed.

Additionally, structured financing and government-backed initiatives are expected to accelerate deployment beyond the current pace, ensuring that the metering gap is addressed efficiently.

“To bridge this gap, the government has put in place key initiatives aimed at significantly improving metering across the country. The Distribution Sector Recovery Program (DISREP) is set to deliver 3,205,101 meters by 2026.

This will be achieved through different procurement models, including 1,437,501 meters through International Competitive Bid 1 (ICB1), 217,600 meters through National Competitive Bid (NCB), and 1,550,000 meters through International Competitive Bid 2 (ICB2). As part of this plan, the first batch of 75,000 meters under ICB1 is expected by April 2025, followed by the second batch of 200,000 meters in May 2025.

“In addition to the DISREP, the ₦700 billion Presidential Metering Initiative (PMI) is another key intervention designed to accelerate metering. The initiative, which has already secured ₦700 billion from the Federation Account Allocation Committee (FAAC), is structured to ensure large-scale meter procurement and deployment.

A Special Purpose Vehicle (SPV) has also been established to oversee the implementation of the initiative. The government has set a target of deploying two million meters annually for five years, with the tender for the first batch of two million meters expected to be released by the third quarter of 2025.

These structured interventions provide a clear roadmap for addressing the metering gap in an effective and sustainable manner”.The statement reveals further that, “while the metering gap remains a concern, the notion that it will take over a decade to resolve is misleading.

With the ongoing DISREP and PMI initiatives, Nigeria’s metering landscape is set to experience significant improvement before the end of the year. The focus should be on the execution of these well-structured plans rather than a blanket critique that overlooks the real progress being made”.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Midnight fire threatens trucks in Ilorin
Next Article Kwara Varsity to host top-tier academic conference on future of higher education
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Senator Natasha tasks NUPRC to prioritise local companies

By Abubakar Ohida The Chairman of the Senate Committee on Local Content, Senator Natasha Akpoti-Uduaghan…

By The Graphic

Adamawa PDP ward congresses conducted peacefully – Kataps

From Joseph Adahnu, Yola The People's Democrat Party (PDP), Adamawa state chapter, has peacefully conducted…

By The Graphic

Kogi Deputy Speaker reinforces support for APC Chairmanship candidate

By OJOTULE ROMANUS As Kogi state sets to elect Local Government Chairmen this weekend, the…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?