Tuesday, 3 Mar 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: Tower collapses: TCN establishes vommittee to develop Advanced Network Monitoring System
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

GLOHWOC demands stronger protection for Nigerians Living with HIV

By The Graphic March 2, 2026

Rescued kidnap victim gives birth to twin girls at IDP Camp — Kogi Govt

By The Graphic March 2, 2026

Kogi Guber: Ododo remains APC’s winning joker – Bode Ogunmola

By The Graphic March 2, 2026

Blood on the Border: How the Woro Massacre shattered quiet life in Kwara North

By The Graphic March 2, 2026

INEC aligns Party Regulations with Electoral Act 2026 to safeguard poll integrity

By The Graphic March 1, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

Tower collapses: TCN establishes vommittee to develop Advanced Network Monitoring System

The Graphic
Last updated: March 13, 2025 7:43 pm
The Graphic
Share
2 Min Read
SHARE

From David Onuoja, Abuja

In a strategic effort to enhance grid stability and mitigating power system disturbances, the Transmission Company of Nigeria (TCN), has inaugurated a Network Monitoring System Development Committee.

According to a statement released by the general manager TCN, Ndidi Mbah, said, the committee’s primary objective, is to design and implement an advanced monitoring system equipped with integrated data analysis and real-time operational awareness capabilities to ensure optimization of generation and transmission resources in grid operations.

During the committee’s inauguration, the Executive Director, Independent System Operations (ISO), Engr. (Mrs) Nafisat Ali, highlighted the importance of this initiative. She Noted that the System Operator is responsible for managing the entire power system network, which includes planning and monitoring operations.

However, the current manual operation poses challenges in terms of visibility and tracking the activities of various stakeholders. On this, Engr. Nafisat, added that the increasing complexity of the power system necessitated the development of a comprehensive Network Monitoring System.

Related News

AEDC explains reason for Power outage in Nasarawa State, Mararaba, Lafia, others
Power outage: 4,300 generation shortfall, reason behind scarce electricity supply in Nigeria -NISO
TCN Clears encroachments activities along Ihovbor–Ajaokuta 330kV Transmission Line
GenCos clarifies capacity payments, PPAs, amidst market challenges
TCN commission’s 300MVA Power Transformer at Egbin Transmission Substation, Lagos

On his part, the Committee Chairman, Engr. Ojo Oladeji, who is also the Assistant General Manager (Research) at ISO, said that TCN’s in-house engineers have proficiently maintained the system with locally developed solutions.

He also mentioned that the committee intends to leverage the capabilities of Phase Measuring Units (PMU), along with existing IoT data to meet its goals.

The eight-member committee will employ domestic technologies, including the Internet of Things (IoT), to develop the Network Monitoring System.

This system will be operational prior to the completion of the ongoing work on the Supervisory Control and Data Acquisition (SCADA) System and will subsequently serve as a backup.

The comprehensive deployment of IoT throughout the grid network, coupled with the integration of artificial intelligence (AI) tools across generation, transmission, and distribution data processing, will significantly enhance the project’s success, it said.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Vandalism in South South as four towers along Owerri-Ahoada collapses
Next Article NSCDC, NOA take Safe School Campaign to Kwara schools, warn against cultism, abuse
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Christmas: Christians urged to embrace patience amid economic hardship 

From Taiye Joseph, Ilorin Christians in Kwara State joined their counterparts worldwide to celebrate Christmas,…

By The Graphic

Ankpa gully erosion: Kogi Government compensates over 700 Project Affected Persons

Ankpa gully erosion: Kogi Government Compensates Over 700 Project-Affected Persons The Kogi State Government has…

By The Graphic

Anambra election: Amupitan urges Security Agencies to halt all forms of vote buying

From David Onuoja, Abuja The new Chairman of Independent National Electoral Commission (INEC), Professor Joash…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?