Thursday, 16 Apr 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: Power: Illegal tampering of Meters, by-pass to pay penalty of N100,000 above
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

SGS Dr. Ayoade applauds Ododo’s investment in education as antidote to terrorism

By The Graphic April 16, 2026

Education minister Alausa inaugurates two model schools in Kogi 

By The Graphic April 16, 2026

KWASU Professor urges FG to adopt Larva Source Management, Geospatial Mapping in Malaria elimination drive

By The Graphic April 16, 2026

Operation Whirlwind intercepts 43,750 litres of smuggled fuel across Niger–Kwara routes

By The Graphic April 16, 2026

15 States take over electricity market under 2023 Electricity Act – NERC

By The Graphic April 15, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

Power: Illegal tampering of Meters, by-pass to pay penalty of N100,000 above

The Graphic
Last updated: February 18, 2025 9:06 pm
The Graphic
Share
2 Min Read
SHARE

From David Onuoja, Abuja

Nigerian Electricity Regulatory Commission (NERC), has warned the public from illegal operations as it announced the penalty for tampering of meters including by-pass from unauthorized person (s) with the administrative charge including meter replacement cost and reconnection charge of N100,000.00 and above.

According to a statement issued in Abuja on Tuesday by the Commission’s Public Communication Department, said, the Amended Order on Unauthorised Access, Meter Tampering, and By-pass replaces Order No: NERC/REG/41/2017 has taken effect from 22 January 2025.

With this, the amendment aligns with the Electricity Act 2023 and the Customer Protection Regulations (CPR) 2023, which allow Distribution Companies (DisCos), to disconnect unauthorised connections without notice and prescribe reconnection conditions.

Statement further said that, “the order aim is to reduce unauthorised access to electricity, meter tampering, and by-pass. To Establish transparent reconnection guidelines to ensure compliance.”

Related News

15 States take over electricity market under 2023 Electricity Act – NERC
Mini grid operators must obey 2026 mini Grid Regulation -NERC
NERC issues transparency order in regional grid transmission 
NISO holds 1st anniversary, reveals achievements, challenges, future plans
Power Boost: TCN set to upgrade Alaoji-Onitsha Transmission Line

The breakdown of penalties of the violators are as follows: Non-MD Single Phase (Residential) 100,000.00 for the first offence but second offense to attract N150,000.00 each while Non-MD three phase (Residential) is N200 and N300 respectively; and Maximum Demand (MD) is 450% to 600%.of last recorded consumptions.

However, NERC has said that if it is the fault of a Discos who refused to reconnect a customer after payment, the Discos will compensate the customer with 100% of his/her daily energy consumption in credit.

On the other hand, the statement did not say anything on the side of Discos if the electricity are disconnected by the Discos Company illegally.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article Ilorin Court remands Cleric, Five others over alleged ritual killing 
Next Article Kogi Assembly expresses shock over Felele road mishap
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

North Central Nigeria prays holds in Lokoja Oct. 26 

The North Central edition of Nigeria Prays Rally for 2025, is to hold in Lokoja,…

By The Graphic

Thousands gather in Ilorin to mourn long-serving Chief Imam

From Taiye Joseph, Ilorin The Ilorin Emirate was awash with grief as thousands of Muslims…

By The Graphic

Kwara SUBEB to recruit 1,611 Teaching and Non-Teaching staff across LGAs

From Taiye Joseph, Ilorin The Kwara State Universal Basic Education Board (KwSUBEB), has announced plans…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?