Monday, 12 Oct 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

AbdulRazaq rolls out 100 vehicles for security agencies, delivers first 25 to police

By The Graphic October 12, 2026

Fintiri mourns Fufore Council Chairman, Dr. Yahaya Saidu

By The Graphic October 12, 2026

Staff training key to achieving our target – NISO Board Chairman

By The Graphic October 12, 2026

Adamawa State marks World Tourism Day in grand style

By The Graphic October 12, 2026

100 candidates jostle for 9 National Assembly seats in Kwara

By The Graphic October 12, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric

The Graphic
Last updated: July 12, 2026 7:44 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Niger Delta Power Holding Company (NDPHC), has officially handed over the rehabilitated Gbarain Power Plant, to a joint venture, which comprises of TILT Energy Limited and Schneider Electric as a replacement of the plant’s burnt Power Control Module (PCM), marking a significant milestone in efforts to restore the 225MW facility.

Speaking during the handover ceremony in Bayelsa, Bayelsa State, the NDPHC’s General Manager and the Generation Projects, Engr. Ginsau Idris, said the PCM was extensively damaged by fire, making its replacement imperative.

He however, expressed confidence in the contractors, noting that all parties clearly understood their responsibilities and were committed to deliver the project successfully and within the schedule.

NDPHC’s Executive Director, Generation, Engr. Abdullahi Kassim, also recalled that the PCM was destroyed by fire in November 2020, just months before the plant was due for commissioning, describing the incident as a major setback to the project.

Related News

Abdulaziz re-elected WAPP Executive Board Chairman
Tegbe’s First 100 Days: Nigeria’s electricity grid gets better
Power Minister holds strategic close-door meeting with DisCos on energy zone 24/7 electricity
TCN commences Abasi-Eket 132kV double-circuit tower rehabilitation 
Tegbe commissions 581kWp Solar Mini-Grid to expand power access in Kwara

Kassim commended the Managing Director/Chief Executive Officer, Engr. Jennifer Adighije, for championing the revival of the project.

He disclosed that complementary infrastructure, including access roads and support buildings, is under construction, describing the Gbarain Power Plant as a strategic asset because of its proximity to gas supply.

Responding, the Managing Director of TILT Energy Limited, Mr. Deji Awodeji, assured stakeholders that the joint venture would complete the rehabilitation within, and possibly ahead of, the 12-month project timeline without compromising quality.

He reaffirmed the partners’ commitment to restoring the plant to operation as quick as possible.

Earlier in her remarks, the Managing Director/CEO of NDPHC, Engr. Jennifer Adighije, said the project was prioritised after the Gbarain Power Plant was identified as a “low-hanging fruit” capable of delivering a quick boost to electricity generation.

She explained that NDPHC secured the necessary approvals and funding in record time and expressed confidence in the contractors’ capacity to execute the project successfully.

According to her, replacing the burnt PCM will pave way for the recommissioning of the 225MW power plant, thereby strengthening electricity supply and supporting the Federal Government’s Renewed Hope Agenda.

The ceremony concluded with an inspection of ongoing works at the project site by NDPHC management, contractors and other stakeholders.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article NPC chairman calls for greater investment in youths, tech- driven census
Next Article Gov Fintiri fumes over alleged escape of two inmates at Yola NCos custody
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Police debunks Bandit scare in Oke-Oyi, says false alarm sparked panic at Girls’ School

From Taiye Joseph, Ilorin The Kwara State Police Command, has dismissed reports of a bandit…

By The Graphic

Kogi State’s Zangiri-Patani International Airport set for revitalisation, enhancement by the FG

By Kehinde Erin The Federal Government, through the Ministry of Aviation and Aerospace Development, has…

By The Graphic

AG, Fagbemi applauds law teacher’s in strengthening democracy

From Taiye Joseph, Ilorin. The Attorney-General of the Federation and Minister of Justice, Prince Lateef…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?