Thursday, 27 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Kogi Assembly moves to curb littering, other harmful practices

By The Graphic August 26, 2026

Kogi Governor donates ₦28.8m to corps member

By The Graphic August 26, 2026

Ododo unveils plans for coal-powered electricity project, mass recruitment

By The Graphic August 26, 2026

Saraki hosts Mustapha, Kolo, urges PDP to close ranks for 2027 victory in Kwara

By The Graphic August 26, 2026

Saraki charges Kwara PDP to put unity ahead of 2027 ambitions

By The Graphic August 26, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric

The Graphic
Last updated: July 12, 2026 7:44 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Niger Delta Power Holding Company (NDPHC), has officially handed over the rehabilitated Gbarain Power Plant, to a joint venture, which comprises of TILT Energy Limited and Schneider Electric as a replacement of the plant’s burnt Power Control Module (PCM), marking a significant milestone in efforts to restore the 225MW facility.

Speaking during the handover ceremony in Bayelsa, Bayelsa State, the NDPHC’s General Manager and the Generation Projects, Engr. Ginsau Idris, said the PCM was extensively damaged by fire, making its replacement imperative.

He however, expressed confidence in the contractors, noting that all parties clearly understood their responsibilities and were committed to deliver the project successfully and within the schedule.

NDPHC’s Executive Director, Generation, Engr. Abdullahi Kassim, also recalled that the PCM was destroyed by fire in November 2020, just months before the plant was due for commissioning, describing the incident as a major setback to the project.

Related News

NERC inaugurates KAEDCO Interim Board, visits Military Formations in Kaduna   
Akwa Ibom set to join electricity market, request NERC transfer order 
TCN commissions 100MVA transformer at Alausa, to boosts Lagos Power capacity to 205MVA
NISO, NBET synergizes to improve efficiency in electricity market in Nigeria
TCN loss Ikot Abasi–Eket 132kV Double Circuit Transmission line to vandalism

Kassim commended the Managing Director/Chief Executive Officer, Engr. Jennifer Adighije, for championing the revival of the project.

He disclosed that complementary infrastructure, including access roads and support buildings, is under construction, describing the Gbarain Power Plant as a strategic asset because of its proximity to gas supply.

Responding, the Managing Director of TILT Energy Limited, Mr. Deji Awodeji, assured stakeholders that the joint venture would complete the rehabilitation within, and possibly ahead of, the 12-month project timeline without compromising quality.

He reaffirmed the partners’ commitment to restoring the plant to operation as quick as possible.

Earlier in her remarks, the Managing Director/CEO of NDPHC, Engr. Jennifer Adighije, said the project was prioritised after the Gbarain Power Plant was identified as a “low-hanging fruit” capable of delivering a quick boost to electricity generation.

She explained that NDPHC secured the necessary approvals and funding in record time and expressed confidence in the contractors’ capacity to execute the project successfully.

According to her, replacing the burnt PCM will pave way for the recommissioning of the 225MW power plant, thereby strengthening electricity supply and supporting the Federal Government’s Renewed Hope Agenda.

The ceremony concluded with an inspection of ongoing works at the project site by NDPHC management, contractors and other stakeholders.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article NPC chairman calls for greater investment in youths, tech- driven census
Next Article Gov Fintiri fumes over alleged escape of two inmates at Yola NCos custody
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

New ASUU President pledges to tackle Brain Drain, Staff Welfare Challenges

Professor Chris Piwuna of the University of Jos has emerged as the new President of…

By The Graphic

Governor Fintiri joins APC, dumps PDP cites State’s Long-Term prosperity

By Joseph Adahnu , Yola Governor Ahmadu Umaru Fintiri of Adamawa State, has left the…

By The Graphic

FIWON celebrates 16th anniversary , inaugurates national executives

By Abubakar Abraham The Kogi State chapter of the Federation of Informal Workers Organisation of…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?