Sunday, 30 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: 2025 new year vandals’: 18 Transmission towers surged within 5days -TCN
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

NPC Chairman Aminu Yusuf dies at 66 after brief illness

By The Graphic August 28, 2026

Woro kidnapped survivors receive N1m, reunite with families after six months in Ccaptivity

By The Graphic August 28, 2026

Kwara NSCDC deepens rural security drive, brings farmers, herders together

By The Graphic August 28, 2026

Saraki: My staying in PDP Is for my people in Kwara, says 2027 victory starts at polling units

By The Graphic August 28, 2026

TCN decries true persecution of its equipments vandals

By The Graphic August 28, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

2025 new year vandals’: 18 Transmission towers surged within 5days -TCN

The Graphic
Last updated: January 19, 2025 11:18 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

As if it was a vandals’ bazaar; within 5days, (5-14 January 2025), 18 Transmission Tower in the Country has been surged; the Transmission Company of Nigeria (TCN) has said.

In a statement released on Sunday evening by the General Manager, Public Affairs department of TCN, Ndidi Mbah, said, the company regretted to announce that over 18 transmission towers were vandalised between January 9 and 14, 2025, across Rivers, Abia, and Kano States.

According to her, “Engr. Emmanuel Okpa, General Manager of Transmission for the Port Harcourt Region, reported that routine patrols by linesmen on January 10, 2025, uncovered damage to towers 171 through 181 and tower 184.

On January 14, vandals targeted towers 146, 147, and 149 along the Owerri/Ahoada 132kV line in Rivers State, removing base brackets and compromising the stability of the towers.

Related News

TCN decries true persecution of its equipments vandals
TCN to AEDC: Your accusation of tripping of Shiroro transmission line, inaccurate, misleading
FG launches RAMCO for power infrastructural sustainability
NISO pushes for stronger Hydro planning and stricter Governor compliance at 2026 Jebba meeting
NERC inaugurates KAEDCO Interim Board, visits Military Formations in Kaduna   

“In Abia State, Engr. Azuh Lucky, Head of the Lines Department for the Region, reported the theft of bolts, nuts, and structural members from towers 160 to 162 on the Alaoji/Umuahia 132kV line, which was under repair on January 13, 2025.

“Meanwhile, in Kano, towers 105, 106, and 107 along the Katsina-Gazoua 132/33kV transmission line were critically damaged by vandals on January 9, 2025, compromising their structural integrity and risking collapse.

“Also, in the early hours of January 17, 2025, vandalized 132kV underground transmission cables were discovered by TCN engineers near Millennium Park in Abuja. This affected power supply to the central area and its environs.

“These incidents pose a significant challenge to our operations as a company. We have bolstered security measures, increased lines patrol, and the number of vigilante groups, and we are also collaborating with security operatives.

“However, we need and are appealing for the full support of every Nigerian, particularly those in communities hosting our installations. We must collectively recognise that the transmission network is our collective asset and essential for our socioeconomic development.

“The vandals and those who buy stolen materials are sabotaging the nation. All hands must be on deck to ensure the growth of the nation’s power sector, which is critical to the development of our country.

“TCN’s grid expansion plans are under tremendous strain due to the persistent vandalism of its installations. The financial implications of constant repairs to vandalized transmission installations, along with the stress on the grid, are having adverse effects on TCNs grid expansion drive”, it said.

TCN, has therefore, make a clarion call on everyone to join forces with TCN to put an end to this menace and safeguard the country’s electricity network.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article 2025 budget: Senator Natasha seeks urgent attention on Ukpogo Cottage Hospital, Okene
Next Article Random Musings with Josephine Ali
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Kwara launches Agricultural initiative to boost Livestock production

From Taiye Joseph, Ilorin The Kwara State government, has unveiled an ambitious agricultural transformation initiative,…

By The Graphic

Fear grip Oke Oyan as bandit attacks, drive families from their Homes

From Taiye Joseph, Ilorin Panic has gripped residents of Oke Oyan, in Ifelodun Local Government…

By The Graphic

Hijrah, the Islamic New Year: A Time for Reflection, Renewal and Hope

By Abdulkarim Abdulmalik As the sun sets on the final days of the Islamic year…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?