Sunday, 30 Aug 2026
Subscribe
The Graphic Newspaper
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education
Reading: NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric
Font ResizerAa
The Graphic NewspaperThe Graphic Newspaper
Search
  • Home
  • News
  • Politics
  • Top Story
  • More
    • Technology
    • The Nation
    • Education

Trending →

Jigawa At 35: Governor Namadi reaffirms commitment to peace, justice and sustainable development   

By The Graphic August 30, 2026

Gov. Bala Mohammed calls for peace, unity in Maulud message

By The Graphic August 30, 2026

ADC Guber Crisis: Omarana drags Party, INEC to Court over alleged substitution in Adamawa

By The Graphic August 30, 2026

NPC Chairman Aminu Yusuf dies at 66 after brief illness

By The Graphic August 28, 2026

Woro kidnapped survivors receive N1m, reunite with families after six months in Ccaptivity

By The Graphic August 28, 2026
Have an existing account? Sign In
Follow US
© 2024 Kogi State Newspaper Corporation. All Rights Reserved.
Power

NDPHC, rehabilitate, hands over Bayelsa Gbarain Power Plant project to TILT/Schneider Electric

The Graphic
Last updated: July 14, 2026 4:37 pm
The Graphic
Share
3 Min Read
SHARE

From David Onuoja, Abuja

The Niger Delta Power Holding Company (NDPHC), has officially handed over the rehabilitated Gbarain Power Plant, to a joint venture, which comprises of TILT Energy Limited and Schneider Electric as a replacement of the plant’s burnt Power Control Module (PCM), marking a significant milestone in efforts to restore the 225MW facility.

Speaking during the handover ceremony in Bayelsa, Bayelsa State, the NDPHC’s General Manager and the Generation Projects, Engr. Ginsau Idris, said the PCM was extensively damaged by fire, making its replacement imperative.

He however, expressed confidence in the contractors, noting that all parties clearly understood their responsibilities and were committed to deliver the project successfully and within the schedule.

Related News

TCN decries true persecution of its equipments vandals
TCN to AEDC: Your accusation of tripping of Shiroro transmission line, inaccurate, misleading
FG launches RAMCO for power infrastructural sustainability
NISO pushes for stronger Hydro planning and stricter Governor compliance at 2026 Jebba meeting
NERC inaugurates KAEDCO Interim Board, visits Military Formations in Kaduna   

NDPHC’s Executive Director, Generation, Engr. Abdullahi Kassim, also recalled that the PCM was destroyed by fire in November 2020, just months before the plant was due for commissioning, describing the incident as a major setback to the project.

Kassim commended the Managing Director/Chief Executive Officer, Engr. Jennifer Adighije, for championing the revival of the project.

He disclosed that complementary infrastructure, including access roads and support buildings, is under construction, describing the Gbarain Power Plant as a strategic asset because of its proximity to gas supply.

Responding, the Managing Director of TILT Energy Limited, Mr. Deji Awodeji, assured stakeholders that the joint venture would complete the rehabilitation within, and possibly ahead of, the 12-month project timeline without compromising quality.

He reaffirmed the partners’ commitment to restoring the plant to operation as quick as possible.

Earlier in her remarks, the Managing Director/CEO of NDPHC, Engr. Jennifer Adighije, said the project was prioritised after the Gbarain Power Plant was identified as a “low-hanging fruit” capable of delivering a quick boost to electricity generation.

She explained that NDPHC secured the necessary approvals and funding in record time and expressed confidence in the contractors’ capacity to execute the project successfully.

According to her, replacing the burnt PCM will pave way for the recommissioning of the 225MW power plant, thereby strengthening electricity supply and supporting the Federal Government’s Renewed Hope Agenda.

The ceremony concluded with an inspection of ongoing works at the project site by NDPHC management, contractors and other stakeholders.

Share This Article
Twitter Whatsapp Whatsapp Telegram
Previous Article TCN, Transport Ministry, partner to power Kano Railway
Next Article Ibaji road project will spur economic growth – Ododo 
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
- Advertisement -
Ad image

Popular Posts

Hijrah 1448 A.H.: PDP Gubernatorial candidate felicitate with Muslims in Kwara on Islamic new year

From Taiye Joseph, Ilorin The Peoples Democratic Party (PDP) gubernatorial candidate in Kwara State, Engineer…

By The Graphic

Shigaba’s defection to APC will silence opposition in Bassa -Gov. Ododo 

By Ojotule Romanus The defection of the main opposition political figure in Bassa Local Government…

By The Graphic

2027: ‘Tinubu will win again’, says Kalu, dismisses INEC claims

...Speaks on Senate Presidency in 2027 From David Onuoja, Abuja The Distinguished Senator Orji Uzor…

By The Graphic
The Graphic Newspaper
Facebook Twitter Youtube Rss Medium

The Graphic Newspaper is a publication of Kogi State Newspaper Corporation

About US



Top Categories
  • Market Trends
  • Tech Moves
Usefull Links
  • Advertise with us
  • Newsletters
  • Complaint
  • Deal

© Kogi State Newspaper Corporation. All Rights Reserved.

- Advertisement -
Ad imageAd image
Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any buzzstream.
Welcome Back!

Sign in to your account

Lost your password?